To receive notifications via email, enter your email address and select at least one subscription below. After submitting your information, you will receive an email. You must click the link in the email to activate your subscription. You can sign up for additional subscriptions at any time.

* Required

*
 
Enter the code shown above.

El Cubo

Overview

Effective November 30, 2019, mining operations at the El Cubo Mine are suspended and the mine, plant and tailings facilities are placed on short term care and maintenance while Management conducts an evaluation of alternatives including final closure. See Endeavour Silver news release dated November 21, 2019

Location 10 km east of Guanajuato City
Access Maintained all-weather gravel road
Property 8,100 hectares
Infrastructure Connected to power grid, readily available water and labour in El Cubo
Mine Underground, ramp access, mechanized long hole & cut-and-fill mining methods
Plant 1,500 tpd capacity flotation plant to produce bulk sulfide concentrates
District Large, multi-vein silver-rich historic district 20 km long by 20 km wide
Widths 1-5 m, average 2 m

2019 Operating Statistics

Production 1,086,824 oz silver
10,464 oz gold
1.9 million ounces of silver equivalent (80:1 silver:gold)
Grades silver 155 gpt/ gold 1.54 gpt
Recoveries silver 88.9%/ gold 86.1%